Pakistan Oil and Gas Expo
Oil Gas Asia
2026.05.12-05.14Open: 09:00-18:00
University Rd, Gulshan-e-Iqbal, Karachi- Pakistan
Annual
1 / 1
Area
2.0万㎡
Exhibitor
418
Attendee
26k
Ticket Sold Out
0
Days to Open: 162days
Photos
8355 Views
图片
展馆图片
Industry:Petro
Organizer:
Pakistan ECG Exhibition Group

Pakistan Oil and Gas Expo Expo Profile

The Pakistan Oil and Gas Expo (Oil Gas Asia) will comprehensively showcase the latest technologies, equipment, and machinery, as well as joint services, providing a clear outlook on the regional oil and gas industry for overseas investors, as well as opportunities to meet potential local counterparts and business partners.

The Pakistan Oil and Gas Exhibition (Oil Gas Asia) covered an exhibition area of 20,000 square meters at its last event, with 418 participating companies from China, Russia, Vietnam, Malaysia, Indonesia, Thailand, Dubai, Iran, etc., and a total of 26,000 participants. (The content of this article is the exclusive property of Juzhan, and unauthorized forwarding is prohibited.)

The oil and gas sector in Pakistan has been identified by the government as a growth engine for economic development, and its unprecedented growth is expected to further promote investment activities in the country. The government is providing an investment-friendly environment for the oil and gas industry to attract both local and foreign investors. The Pakistan Oil and Gas Exhibition (Oil Gas Asia) is the best trade platform for Chinese oil and gas enterprises to enter Pakistan.

Exhibitor List

Pakistan Oil and Gas Expo
Exhibitor: 0
$0.00

Pakistan Oil and Gas Expo Range

Machinery and Equipment: oil wells, drilling, welding, storage tank equipment, lifting, hoisting, elevating, insulation, refrigeration, ventilation, remote monitoring, maintenance, repair, etc. equipment; generators, fuel pumps, turbines, steam turbines, centrifugal machines, etc. machinery; valves, pumps, compressors, fans, air separation equipment, vacuum equipment, jacks, boilers, furnaces, pressure vessels, cooling machines, flanges, pipelines, hoses and their connectors, industrial explosion-proof products, industrial power supply, electric transmission devices and their assemblies, and various supporting equipment and chemical machinery, etc.

Instrumentation: transformers, stabilizers, recorders, filters, temperature sensors, measurement instruments, filter nets, sieves, etc. (The content of this article is the exclusive property of Juzhan, and unauthorized forwarding is prohibited.)

Technical Services: refining technology, surveying, mapping, extraction, purification, refinement, separation, liquefaction, welding, pressure transmission testing, quality testing, pollution control protection, flow rate control technology; computer data management; oil depot engineering, electrical engineering, engineering consulting; safety, alarm, emergency shutdown, risk control, operation process control, pipeline protection, fire alarm equipment, industrial safety and labor protection supplies, experiments and simulations, etc.

Others: all petroleum, petrochemical, natural gas products; drilling platforms, steel structures; insulating materials; indicator equipment, etc.

AsiaPetro Related exhibition
Floorplan
Floorplan
Exhibitor Directory
Exhibitor Directory

Pakistan Oil and Gas Expo Booth Sales

刘经理
Mr Liu
Tel 0571-88611413
Wechatwechat
Wechat

Pakistan Oil and Gas Expo Ticket Sales

韩经理
Mr. Han
Tel 0571-88683357
Wechatwechat

Pakistan Oil and Gas Expo Venue

Karachi Expo CenterView map

Pakistan Oil and Gas ExpoCommunity

头像
苏州国鼎贸易有限公司
189****6436
View
头像
上海威探
158****8747
View
头像
1
176****9501
View

Pakistan Oil and Gas Expo Booth price

Standard booth

Standard booth Configuration

Carpet
A desk
2~3 chair
A wastebasket
Company board
2~3 spotlight
Two (three) face wall panels
Standard booth Price:View price
For reference only, the actual booth configuration shall prevail
Blank booth

Blank booth Configuration

No facilities included
Comply with pavilion restrictions
Minimum size required
Blank booth Price:View price
For reference only, the actual booth configuration shall prevail

Pakistan Oil and Gas Expo Process

1.Submit the business license of the company

2.Submit product picture and name

3.Receive exhibition presentation documents and booth drawings

4.Submit booth application form/Sign booth contract

5.Pay the contract booth deposit

6.Prepare for exhibition

Application
Get Ticket
Exhibitor
Warm
There is a certain risk of change in the exhibition time and location. Please refer to the electronic ticket voucher received. The exhibition will also provide phone and SMS notifications for users who book tickets to avoid travel losses.
Notification
Check for changes in show hours and transportation information at your fingertips.
Public account
Mini program
Booth Sales
刘经理
Mr Liu
Tel: 008617366644759
WeChat
Office hours: Monday to Friday 09:00-18:00

Cooperation

Power & Alternative Energy Asia

Pakistan Power and Energy Exhibition
2026.05.12-05.14
9053 ViewsDays to Open: 162 days

Solar Windtech Asia

Pakistan Solar and Wind Energy Exhibition
2026.05.12-05.14
8670 ViewsDays to Open: 162 days

Auto & Transport Asia

Pakistan Auto Parts and Logistics Transportation Exhibition
2026.05.12-05.14
9554 ViewsDays to Open: 162 days

Machine Tools & Hardware Asia

Pakistan Hardware Exhibition
2026.05.12-05.14
7549 ViewsDays to Open: 162 days

Engineering Asia

Pakistan Engineering Machinery Expo
2026.05.12-05.14
6976 ViewsDays to Open: 162 days

Fluid Pump Asia

Pakistan Pump Valve and Fluid Machinery Expo
2026.05.12-05.14
4499 ViewsDays to Open: 162 days

Petro Fair

More

India Energy Week
India Energy Week
2.5w Views
Avatar
Days to Open: 57 days
LIBYA OIL & GAS FAIR
LIBYA OIL & GAS FAIR
913 Views
Avatar
Waiting update time...
ICEE
ICEE
5801 Views
Avatar
Days to Open: 220 days
CIPPE
CIPPE
热门CIPPE
3.9w Views
Avatar
Days to Open: 115 days
Aktobe NefteKhim
Aktobe NefteKhim
666 Views
Avatar
Waiting update time...
PALMEX
PALMEX
1185 Views
Avatar
Days to Open: 156 days
Italy Offshore Oil Expo
OMC MED ENERGY
8102 Views
Avatar
Days to Open: 498 days
Russia Gas Equipment and Transport Vehicle Expo
GasSuf
8563 Views
Avatar
Days to Open: 322 days
Pakistan Oil and Gas Expo
Ticket : Sold out
  • iconService

    Booth: 0571-88560061

    Spectator: 0571-88683357

    门票咨询

    韩经理

    Mr. Han

    金牌项目经理

    Tel 0571-88683357

    Mobile phone 13336023729

    Wechat

    展位咨询

    刘经理

    Mr Liu

    金牌项目经理

    Tel 0571-88611413

    Mobile phone 17366644759

    Wechat

    Work time:Monday to Friday09:00-18:00

  • iconMy
  • iconTicket
  • Booth apply