Nuclear Power Expo (NPE) Piacenza, Italy
Exhibitor Directory / E-Catalog

Choose a catalog

(Click to select)
2026 Nuclear Power Expo (NPE) Piacenza, Italy
Website
¥50
Select
Buy now
Online Electronic Newsletter
2025 Nuclear Power Expo (NPE) Piacenza, ItalyOnline Electronic Newsletter
Phone
Email
Website
Exhibitors:231
¥70
Preview
Buy now

Nuclear Power Expo (NPE) Piacenza, ItalyCatalog consultation

Manager Weng
Directory sales
Direct +86 13732395222
whatsApp
whatsApp

Before you buy:

1. The exhibitor directory / e-catalog will be delivered within 1–2 business days by email to the applicant's inbox . Please check your mail (including spam). If you still do not receive it, contact 0571-88535771.

2. Online directories are for viewing only — no email delivery , and text cannot be copied .

3. Items marked “includes phone / email” include contact details; unmarked items do not.

Fair basics

Name
Nuclear Power Expo (NPE) Piacenza, Italy
Venue
Loc. Le Mose Via Tirotti, 11 29122 Piacenza Italy
Short name
Nuclear Power Expo
Dates
2026.06.09-06.11
Organizer
Nuclear Power Expo
Hall
Piacenza Expo
Visitors
12800
Exhibitors
300

Industry scope

Nuclear Island:Reactors and cooling systems, reactor core fuel, nuclear fuel assemblies, pressurizers, reactor internals, reactor pressure vessels, control rod drive mechanisms, steam generators, reactor coolant pumps, containment structures, Emergency Core Cooling Systems (ECCS)

Conventional Island:Turbogenerators, steam turbines, generators, transformers, condensers, moisture separator reheaters (MSR), turbine blades, instrumentation & control (I&C), insulation materials, HVAC systems, nuclear air purification & ventilation filtration equipment, electrical systems, cables, wires & cable trays, busbars, advanced emergency power supply systems, energy storage, UPS, advanced high-voltage equipment, power transmission & distribution equipment, nuclear-grade fasteners (bolts), nuclear-grade coatings, pipes, pumps & valves, pressure vessels, supports & hangers, nuclear-grade graphite, nuclear welding, machining, computer-aided design (CAD), nuclear simulation, heat treatment, construction machinery, nuclear equipment standardization & qualification/certification

Nuclear Power Plant Operation & Maintenance:Lifting equipment, rigging hardware, specialized tools (electric, pneumatic, manual), specialized robots for nuclear reactors, nuclear safety protection equipment & materials, radiation protection equipment & products, personal protective equipment (PPE) & nuclear emergency equipment, emergency communication devices for nuclear accidents, CBRN detection equipment, nuclear industry detection instruments, nuclear contamination detection instruments, in-service inspection (ISI), non-destructive testing (NDT) / industrial endoscopes, condition monitoring, fault diagnosis, specialized nuclear maintenance, transportation & logistics

Nuclear Power Plant Infrastructure:Nuclear-grade cement, concrete admixtures, nuclear power plant coatings, nuclear waterproofing, nuclear-grade chemical building materials, firestopping for nuclear power plants, etc. (Copyright belongs to Juzhan. Unauthorized reproduction is prohibited.)

View more

Photos

More fair catalogs

2027.03.22-03.24
Iraq Energy Expo (IEE) - International Exhibition for Power, Solar PV & Energy Storage
Baghdad International Fairground
Details
2026.11.02-11.05
Middle East Abu Dhabi International Petroleum Exhibition and Conference
Abu Dhabi National Exhibitions Centre(ADNEC)
Details
2026.09.08-09.10
Côte d’Ivoire West Africa Electricity, Energy, and Solar Power Exhibition
Abidjan Exhibition Centre
Details
2027.01.28-01.31
India Oil & Gas Exhibition - India Energy Week
New Town Eco Park
Details
2026.11.25-11.28
3E Expo Philippines
SMX Convention Center Manila
Details
2027.02.24-02.26
Power & Energy Africa
Addis Ababa Exhibition Center
Details

Order details

Contact info

Total

0.00
Non-refundable
Directories and e-catalogs are digital goods and cannot be refunded or exchanged.
E-invoice
You can request an e-invoice from the order page; it will be emailed within about 1–5 business days.