Verified: updated on

Kuala Lumpur Raillogo

Rail Solutions Asia

Rail Solutions Asia

Dates
Show Hours:
Venue
Kuala Lumpur Convention Centre
Highlights
Southeast Asia’s largest and most professional railway and rail transit exhibition
Standard booth
Standard booth|9 m² incl. basic setup
Blank booth
Blank booth|From 18 m², construction not included
View Floor PriceBooth Consultation

Group tour

Tour itinerary

Duration5 days / 4 nights

Airport transferLocal receptionEntry badge4-star hotelBusiness mealsFull transportSightseeing

8000 CNY/person
View itinerary

Exhibition Data

1/1
Edition
15000㎡
Exhibition area
268
Exhibitors
12000
Visitors

Kuala Lumpur Rail Expo Details

The Rail Solutions Asia exhibition in Malaysia is dedicated to the Southeast Asian rail transit industry, bringing together suppliers and operators from sectors such as rolling stock systems, signaling and communications, and safety monitoring. Backed by railway authorities and metro operators across the region, the event attracts more than 80 representatives from Asian operators, serving as a key platform for sharing technological trends and fostering business partnerships.
Industry:
Rail fairMalaysiaRail fairKuala LumpurRail Expo
Organizer:
TDH Exhibitions Ltd. (UK)
City:
MalaysiaKuala Lumpur
Venue:
Kuala Lumpur Convention Centre
Address:
Kuala Lumpur City Centre, Kuala Lumpur, 50088, Malaysia

Profile

Rail Solutions Asia is Southeast Asia's largest and most professional railway and rail transit exhibition. The event has achieved remarkable results and is highly supported and recognized by railway authorities and metro companies across Southeast Asian countries.

The exhibition covers products and services in areas such as rail transit systems, rolling stock, signaling and communication systems, maintenance equipment, ticketing systems, and safety and monitoring systems. Exhibitors can showcase their products and services, connect with potential clients and partners, understand market demands and trends, and explore new business opportunities.

At Rail Solutions Asia, railway operators account for the highest proportion of visitors. Conference attendees make up 30% of the total attendance, with representatives from over 80 Asian operators present, followed by suppliers, contractors, consultants, government and educational institutions, and metro operators.

Juzhan Exhibition, centered on innovative technology and service experience, has won widespread acclaim. Rail Solutions Asia aims to provide a platform for rail transit industry professionals to network and showcase the latest products and technologies.

Rail Solutions Asia tickets are e-tickets. Domestic and international visitors must complete online pre-registration with real-name passport verification. After purchase, the organizer verifies visitor identity. Visitors who do not meet entry requirements may need to submit additional documents. Once approved, you will receive email confirmation or a QR code. On site, present your original passport and confirmation letter to collect a paper badge, or scan the QR code to enter.

View more

Rail Solutions Asia Range

Is my product suitable?

Railway Vehicle Technology

LocomotivesFreight CarsSubwaysLight Rail VehiclesTraction EquipmentControl SystemsElectrical ComponentsElectronic ComponentsDoor SystemsCable Assemblies

Infrastructure Construction

Track ConstructionCivil EngineeringSignaling and Communication TechnologiesTrain Control EquipmentTrack Safety EquipmentPlatform EquipmentTrack Maintenance Vehicles

Passenger Transport Technologies

Passenger Information SystemsPublic Address SystemsSmart Card TechnologiesData Processing SystemsOffice Systems

Railway Vehicle Interiors

Seat MaterialsCarpetingFlooringInterior PanelingHeating EquipmentVentilation EquipmentAir Conditioning EquipmentKitchen EquipmentSanitary EquipmentIn-Vehicle LightingLuggage RacksEntertainment Systems

Booth Sales

2026 Kuala Lumpur Rail Ticket Sales

Kuala Lumpur Rail Venue

Kuala Lumpur Convention Centre
Address: Kuala Lumpur City Centre, Kuala Lumpur, 50088, Malaysia
Kuala Lumpur Convention Centre实景图
Kuala Lumpur Convention Centre实景图
Kuala Lumpur Convention Centre实景
Kuala Lumpur Convention Centre实景
Kuala Lumpur Convention Centre实景图
Kuala Lumpur Convention Centre实景
Kuala Lumpur Convention Centre实拍图
Kuala Lumpur Convention Centre实拍图
Kuala Lumpur Convention Centre实拍图
Kuala Lumpur Convention Centre实景图
Kuala Lumpur Convention Centre实拍图
Kuala Lumpur Convention Centre实景图
Kuala Lumpur Convention Centre实拍
Kuala Lumpur Convention Centre实景图

Venue transport

Metro / rail

LRT (Kelana Jaya Line) – KLCC Station: This is the nearest station. After exiting, it’s approximately a 15-minute walk to the venue.

MRT (Putrajaya Line) – Persiaran KLCC Station: Upon exiting, follow the covered pedestrian walkway for about a 14-minute walk to reach the venue.

Air

From Kuala Lumpur International Airport: Take the Airport Rail Link to the KL Sentral station, then transfer to the LRT light rail to KLCC Station. The entire journey takes approximately 35 minutes.

Kuala Lumpur Rail Booth Price

Standard booth
Standard booth|9 m² incl. basic setup
Blank booth
Blank booth|From 18 m², construction not included
View Floor PriceBooth Consultation

Process

  1. 1.Submit the business license of the company
  2. 2.Submit product picture and name
  3. 3.Receive exhibition presentation documents and booth drawings
  4. 4.Submit booth application form/Sign booth contract
  5. 5.Pay the contract booth deposit
  6. 6.Prepare for exhibition