Shanghai Aero-Engine and Gas Turbine Focus Conference and ExhibitionCatalog consultation

Before you buy:
1. The exhibitor directory / e-catalog will be delivered within 1–2 business days by email to the applicant's inbox . Please check your mail (including spam). If you still do not receive it, contact 0571-88535771.
2. Online directories are for viewing only — no email delivery , and text cannot be copied .
3. Items marked “includes phone / email” include contact details; unmarked items do not.
Fair basics
Industry scope
Gas Turbine Complete Units: Gas turbine core, generator set, and associated auxiliary equipment
Combustion Systems: Combustion chambers, flame tubes, fuel nozzles, igniters, etc.
Integrated Gasification Combined Cycle (IGCC): Gas turbines, steam turbines, waste-heat boilers, generators, blowers, compressors, etc.
Turbines: Turbine casings, stators, rotors, seals, exhaust diffusers, compressors, etc.
Auxiliary Equipment: Fire-fighting systems, noise-reduction devices, ventilation systems, compressors, etc.
Automatic Control and Auxiliary Systems: Gas-turbine TCS controllers, air-handling systems, starting systems, intake filtration systems, lubrication systems, cooling systems, fuel systems, internal control equipment and valve‑pipeline assemblies, measurement and sensor systems, compressors, etc.
Structural Components: Cylinder blocks, diaphragms, blades, couplings, bearings, composite materials, high‑temperature alloys, forgings, valves, coatings, compressors, etc.
System Simulation: Computer software, 3D printing, equipment inspection and testing, compressors, etc.
Solutions: Distributed energy (clean energy) solutions, gas-turbine operation and maintenance solutions, compressors, etc.
Other: Universities and research institutes (providing technical and R&D support), consulting firms, insurance companies, compressors, etc.


