Verified: updated on

TOP PICK
Beijing Offshore Wind Engineering & Equipment Exhibition (CWP Offshore)
CWP Offshore
- Dates
- Show Hours:
- Highlights
- A specialized trade show covering the entire industrial chain of offshore wind power engineering and equipment.


Beijing Offshore Wind Engineering & Equipment Exhibition (CWP Offshore) Same Period Exhibition
Exhibition Data
- 1/1
- Edition
- 100000㎡
- Exhibition area
- 1000
- Exhibitors
- 120000
- Visitors
Beijing City Wind Energy Expo Details
- Organizer:
- CWP Organizing Committee
- City:
- Beijing
- Venue:
- Address:
- No. 88, Yuxiang Road, Shunyi District, Beijing
Profile
The Beijing Offshore Wind Engineering & Equipment Exhibition (CWP Offshore) will comprehensively focus on innovative achievements and cutting-edge technologies in the offshore wind sector, driving the industry to new heights. By exhibiting at CWP Offshore, you will have the opportunity to engage in face-to-face exchanges with industry experts and decision-makers, expand your professional network, and enhance your corporate brand influence.
By showcasing your latest products and technologies, you will gain valuable market feedback and insights into industry trends, providing strong support for product R&D and market expansion. During the exhibition, multiple high-end forums and technical seminars will be held, inviting authoritative industry experts to share their latest research findings and development trends, thereby creating a valuable platform for learning and exchange for enterprises.
Invited Exhibitors: Leading domestic and international wind power enterprises such as Goldwind, Envision Energy, Mingyang Smart Energy, Windey, CRRC, CSSC Science & Technology, Sany Renewable Energy, Shanghai Electric Wind Power, Dongfang Electric, Sinovel, Xinglan Wind Power, Huadian Heavy Industries, Longyuan Zhenhua, Huisman, ZTT, Concord O&M, Juli Sling, Hengtong Group, Yilite, Panda Technology, and Alfagomma will present industry-leading products and technologies.
Amid the global energy transition, offshore wind power has become a core track for achieving China's "Dual Carbon" goals. It is projected that by 2030, China's total installed offshore wind capacity will exceed 200 GW, with total investment reaching approximately RMB 2.6 trillion, driving the total output value of the industrial chain to over RMB 20 trillion. As development scales continue to expand, deep-sea and far-offshore areas will become the main battleground for offshore wind development. Cutting-edge technologies such as clustered development, large-capacity turbines, and floating wind power will become key directions for future growth.
We look forward to welcoming you to Beijing for the Beijing Offshore Wind Engineering & Equipment Exhibition (CWP Offshore) to jointly propel the offshore wind industry to new heights. Let us join hands and embark on a new journey of harnessing the winds of the deep blue sea!
Beijing Offshore Wind Engineering & Equipment Exhibition (CWP Offshore) tickets are e-tickets. Mainland China visitors must complete online pre-registration with real-name ID verification; overseas visitors must use passport verification; Hong Kong, Macao, and Taiwan visitors must use their travel permit. On site, verify entry with your ID card or by scanning the e-ticket QR code.
Partial exhibitor directory and exhibitor list for Beijing Offshore Wind Engineering & Equipment Exhibition (CWP Offshore): 3M中国有限公司, 阿美特克商贸(上海)有限公司, 北京曙光新航科技有限公司, 北京特倍福电子技术有限公司, 辰力集团有限公司, 成都瑞迪智驱科技股份有限公司, and others. The 2026 edition is expected to feature 500+ exhibiting companies. To obtain the full exhibitor directory (including booth numbers and contact details), please visit the official exhibition website or contact Jufair.
CWP Offshore Exhibitior List
Beijing Offshore Wind Engineering & Equipment Exhibition (CWP Offshore) Range
- Classification Society
- Construction and Installation
- Survey and Design
- Platform Lifting Equipment
- Piling Equipment
- Hydraulic Equipment
- Lifting Gear and Rigging
- Aerial Work Equipment
- Underwater Robots
- Explosion-Proof Electrical Equipment for Platforms
- Platform Air Conditioning and Ventilation
- Piping, Pumps, and Valves
- Alarm and Monitoring Systems
- Life-Saving and Firefighting Equipment
- Instruments and Meters
- Submersible Support Vessels
- Platform Steel Structure Fabrication
- Corrosion Protection and Coatings
- Welding Equipment
- Salvage and Rescue Vessels
- Nondestructive Testing
- Offshore Wind Power Installation Vessels
- Underwater Engineering
- Water Treatment Technologies and Equipment
- Offshore Construction
- Electrical Wires and Cables
- Platform Mooring Systems
- Marine Environment and Safety
Booth Sales

Mr LiuGold-Medal PM
3 Years Booth Sales

Gold-Medal PM
3 Years Booth Sales
2026 Beijing City Wind Energy Ticket Sales

Mr. HanGold-Medal PM
3 Years Booth Sales

Ms. LiuGold-Medal PM
3 Years Booth Sales
Beijing City Wind Energy Venue
Beijing City Wind Energy Booth Price


Process
- 1.Submit the business license of the company
- 2.Submit product picture and name
- 3.Receive exhibition presentation documents and booth drawings
- 4.Submit booth application form/Sign booth contract
- 5.Pay the contract booth deposit
- 6.Prepare for exhibition







